Manufacturing · Morbi, Gujarat

From cell selection to packed modules, each step is built for consistency.

A disciplined process that protects module quality and output at every stage.

250 MWManufacturing capacity
12Production stages
25+Quality checkpoints
EL · FlashVisual testing too

Production line

Raw material to dispatch, in twelve steps

Every module follows the same controlled sequence — with inspection built into the line, not added at the end.

  1. Step 01

    Raw Material

    Cells, glass, EVA, backsheet, frame, and junction boxes are checked before production.

  2. Step 02

    Cell Sorting

    Cells are sorted by power and colour grade, so every string is matched for consistent output.

  3. Step 03

    Stringing

    Matched cells are aligned and connected into strings with controlled handling.

  4. Step 04

    Layup

    Strings are placed between glass, EVA and backsheet, bussed and aligned in the module stack.

  5. Step 05

    EL Test

    Electroluminescence imaging reveals micro-cracks and hidden cell defects before the stack is sealed.

  6. Step 06

    Lamination

    The panel structure is sealed under process control for strength and weather resistance.

  7. Step 07

    Framing

    An aluminium frame is fitted and sealed around the laminate for rigidity and safe mounting.

  8. Step 08

    Junction Box

    The junction box is bonded, connected and sealed to carry power safely out of the module.

  9. Step 09

    Flash Test

    A solar simulator measures each module's electrical performance and confirms its rated power.

  10. Step 10

    Final QC

    A final visual and electrical inspection checks finish, labelling and safety before approval.

  11. Step 11

    Packing

    Approved modules are packed with edge protection and palletised to arrive undamaged.

  12. Step 12

    Dispatch

    Orders are planned and dispatched on schedule to dealers, EPC sites and project locations.

Quality promise

Built to keep generating when the site gets real.

Panels face heat, dust, monsoon, handling, and years of daily cycling. Our process keeps durability and repeatable performance at the centre.

25+ quality checkpoints across the line
  • Visual
  • EL
  • Flash
98% EL & visual inspection
96% Flash test validation
94% Packaging protection